Kayseri WWTP Project- Turkey - Case Study
Courtesy of ASTIM A.S.
- Customer: VA TECH WABAG (Germany)
- Project Name: Kayseri WWTP
- Capacity: 160.000 m³/ d
- Manufacturing year: 2002
Scope of supply
- 3 pcs. Cable Operated Coarse Bar Screen with 30 mm. bar spacing, material of dry parts is St- 37 and wet parts is AISI 316 Ti
- 3 pcs. Cable Operated Fine Bar Screen with 10 mm. bar spacing, material of dry parts is St- 37 and wet parts is AISI 316 Ti
- 9 pcs. Screw conveyors in different sizes, completely AISI 316 Ti
- 2 pcs. 12 m. Longitudinal Grit- Grease Scraper Unit with grit suction pump, material of dry parts is St- 37 and wet parts is AISI 316 Ti
- 1 pcs. AGS 27 Grit Classifier, completely AISI 316 Ti
- 5 pcs. Various dimensions penstocks, completely AISI 316 Ti
- 18 pcs. Various dimensions penstocks, completely AISI 316 Ti
- 2 pcs. Lime Silo, 50 m3 capacity
- 1 pcs. Ø 20 m. Picket Fence Sludge Thickener, completely AISI 316 Ti
- 2 pcs. Ø 38 m. Primary Sedimentation scraper with full rotating bridge, scum suction mechanism, material of dry parts is St- 37 and wet parts is AISI 316 Ti
- 4 pcs. Ø 60 m. Secondary Sedimentation scraper with full rotating bridge, scum suction mechanism, material of dry parts is St- 37 and wet parts is AISI 316 Ti
- 2 pcs. Inclined Belt Conveyors
- 2 pcs. Double Shaft Paddle Mixers,
-