log-deck Downloads
9 downloads found
Heavy rectangular tube frame with enclosed chain return. Roller-type industrial chain means less wear and longer life than drag chains. - Stops on loading end to keep logs from falling back off when loading. Deck front is heavy-gauge steel plate with hydraulic stop & loader built-in. Heavy-duty D80 drive is available with cither electric or hydraulic ...
The effectiveness of a firewood processor depends, among other things, how fast you can feed fresh logs into the machine. The log deck is loaded by means of a pallet fork (with a universal claw) or timber claw. The operator does not have to do any unnecessary hoisting. It is recomended that the log deck be ...
34-ton splitter (required for 8-way H wedge). Hydraulic Folding Log Deck. Extended live deck (8') with bearing upgrade. 4-, 6-, or 8-way hydraulically adjustable wedge. Hydraulic log stop adjustable 12-24" length. Automatic clamping. Extended infeed conveyor to 20′. Extra live deck legs, dual drive ...
Quick change hydraulically adjustable box wedge (10 to 12-way split). Hydraulic Folding Log Deck. Extended infeed conveyor to 20′. Extra live deck legs, dual drive available. Trap doors for last piece assist (easy end-of-log cutting). Operator safety cage. Heated operators cab. Air conditioning (hydraulically driven or 120V ...
Quick change hydraulically adjustable box wedge 10 to 12-way split. Hydraulic Folding Log Deck. Extended infeed conveyor to 20′. Extra live deck legs, dual drive available. Trap doors for last piece assist (easy end-of-log cutting). Operator safety cage. Heated operators cab. Air conditioning (hydraulically driven or 120V ...
Fig. 2Oil Level & TempOil Filler Fig. 1 The log decks need to be lowered before the logs can be placed on top. Be careful to keep hands away from the hinge points. ...
The wedge is equipped with a quick-release.Patented log-stop A, tipping deck B and safety rollers CAs the deck is in the rear position, the log-stop is in the operatingposition. ...
Fig. 4 Fig. 5Oil Level & TempOil Filler The log decks need to be lowered before the logs can be placed on top. Be careful to keep hands away from the hinge points. ...
Fig. 4 Fig. 5Oil Level & TempOil Filler The log decks need to be lowered before the logs can be placed on top. Be careful to keep hands away from the hinge points. ...