Manure Pumping Articles

  • Brief introduction of the cow manure fertilizer production line

    The cow manure fertilizer production line is a complete set of equipment for processing organic fertilizer with cow manure as raw material. The cow manure in the dung urinal can be pumped into the equipment by the cow manure treatment machine first through the mud pump, and then dehydrated by the equipment. After treatment, the water content is about ...

  • Crisafulli vertical and trailer pump testimonial Gregerson`s Colorado dairy farm-case study

    Four Crisafulli Pumps. Gregerson's Colorado Dairy Farm, running 1,500 head, moves liquid manures, fluids and sludges with four Crisafulli pumps: two electric vertical pumps, a six inch PTO trailer mounted pump and a 7.5 horsepower electric lift pump. "We have not experienced trouble with any of these pumps, not even over the summer months when we use both the trailer mounted pump and the lift ...


    By SRS Crisafulli, Inc.

  • Crisafulli vertical and trailer pump testimonial Gregerson`s Colorado dairy farm-case study

    Four Crisafulli Pumps. Gregerson's Colorado Dairy Farm, running 1,500 head, moves liquid manures, fluids and sludges with four Crisafulli pumps: two electric vertical pumps, a six inch PTO trailer mounted pump and a 7.5 horsepower electric lift pump. "We have not experienced trouble with any of these pumps, not even over the summer months when we use both the trailer mounted pump and ...


    By SRS Crisafulli, Inc.

  • Huxley hutterite brethren colony case study

    A. Farm Description Barn Type: 80 stall free stall barn with saw dust on floor. Manure Handling: Barn houses 80 cows over 8 pits, each 7 feet deep and 12 feet wide. Manure is stored under the slatted floor for 6 months and then agitated and pumped out. B. The Problems: As the pits are pumped ammonia levels rise significantly resulting in problems for barn staff ...


    By Nordevco Associates Ltd.

  • Dairy farm New Mexico, USA

    Type of Wastewater System: Facility to Lagoon For Solid and Wastewater Collection Problem: This facility has an expensive liner in its lagoon, and the use of equipment to remove the solids from the lagoon was not an option. It also dewaters the lagoon via irrigation onto row crops every 30 days. The buildup of solids in the lagoon had reached a point of capacity such that they ...


    By Roebic Laboratories, Inc.