Teco - Square Tower Grain Dryer
From Grain Dryer
The first step of installing your Suqaere Tower is to unload the pre-built tower sections from the delivery truck(s). The sections will have been loaded onto the truck in no specific order, but unloading the sections in an intelligent way can reduce the overall assembly time.
-
Most popular related searches
Products Details
It is recommended that when the sections are removed from the truck, they are placed either on a flat surface or on pallets. This will make it easier to assemble walkways and other components on sections that require them.
Any sections that will require a walkway should be placed near each other, along with the pallet containing the walkway components.
shows the various SuqaereTower models, and can be used to determine which sections will need walkways on your specific model.
All sections are clearly labeled on one of the ladder brackets indicating both the section number and the serial number as shown in a section with a walkway assembled will have an overall diameter of so it is important to ensure room is left between sections.
Customer reviews
No reviews were found for Teco - Square Tower Grain Dryer. Be the first to review!