Poultry Equipment Production Equipment In Asia & Middle East
-
Manufactured by Toplea Machinery Imp &.Exp Co., Ltd.based in CHINA
Product Detail Model No.: TP-DG450 Production Capacity: 300 Sets/ Year Delivery Date: 1-2 Months The maximum power: 505KW Bore X Stroke: 135*155mm Rated Speed: 1500rpm Maximum backpressure allowed: 6kPa Air intake: 39.45m3/min Means of Transport: Ocean Packing: Seaworthy Packing Brand Name: TOPLEA Cylinder number: 12 Compression ratio: 16: ...
-
Manufactured by Toplea Machinery Imp &.Exp Co., Ltd.based in CHINA
Product Detail Means of Transport: Ocean Packing: Moisture Proof Brand Name: TOPLEA Grid Size: 22mm x 40mm x4.4mm Triangle beam: PVC Material Color: White Weight: 2700g Product Feature: Reasonable grid design Production Capacity: 300 Sets/ Year Delivery Date: 1-2 Months Material: PP Thickness: 45mm Industry: Poultry Farming ...
-
Manufactured by Toplea Machinery Imp &.Exp Co., Ltd.based in CHINA
Product Detail Model No.: 9DJF-19200 Production Capacity: 300 sets Delivery Date: 1-2 months Temperature display precision: 0.01℃ Temp control range: 30.5℃~39.5℃ Humidity control accuracy: 3%RH Egg turning display: 1~99 times Industry: Poultry farm equipment Means of Transport: Ocean Packing: Dampproof Brand ...
-
Manufactured by Toplea Machinery Imp &.Exp Co., Ltd.based in CHINA
Product Detail Model No.: JD Production Capacity: 300 SETS/ YEAR Delivery Date: 1-2 Months Conveying Capacity: 1400kg/h, 2500kg/h and 4500… Material/Thickness: PVC/3.3-5mm Helical Slope: 60-70mm Material of Feed Tower: Galvanized Feed Silo Height: 3.50-6.50m Means of Transport: Ocean Packing: Moisture Proof Brand Name: TOPLEA Pipe ...
-
Manufactured by Toplea Machinery Imp &.Exp Co., Ltd.based in CHINA
Product Detail Means of Transport: Ocean Packing: Moisture Proof Brand Name: TOPLEA Inner: Stainless steel Service Life: More than 10 years Supply Capacity: Each drinker for 10-12 broi… Double sealing structure: No water leakage Delivery: 30 days after receipt of do… Production Capacity: 300 Sets/ Year Delivery Date: 1-2 Months ...
Need help finding the right suppliers? Try XPRT Sourcing. Let the XPRTs do the work for you