A 10’ x 60’ (3m x 18m) BioReactor was installed 2009 at a 1700 cow dairy farm. The BioReactor is composting dewatered dairy manure. The retention time is 4 days and there is no stabilization period. The compost is used for bedding the herd and soil restoration.
Most popular related searches
dairy farming
dairy farming operation
manure dewatering
compost dewatering
farming operation
dairy manure
composting
manure composting
composter
dairy cattle farming
Also operating at a dairy farm operation, this 10’ x 60’ (3m x 18m) BioReactor composts the dewatered manure.