Dairy Farm Installations - Case Study

SHARE
Nov. 27, 2023

A 10’ x 60’ (3m x 18m) BioReactor was installed 2009 at a 1700 cow dairy farm.   The BioReactor is composting dewatered dairy manure.  The retention time is 4 days and there is no stabilization period.  The compost is used for bedding the herd and soil restoration.

Most popular related searches

Also operating at a dairy farm operation, this 10’ x 60’ (3m x 18m) BioReactor composts the dewatered manure.