Dryholme Ad Facility - Case Study
Dec. 31, 2010
Biogass Renewables General Manager Joseph Oliver in a previous role working with Farmgen, Undertook the Develop, Design, Finance, Build, Commission and Operate of Dryholme AD facility, processing agricultural waste streams for power production in Cumbria UK
Most popular related searches
agriculture waste stream
agriculture waste
agriculture power
agriculture waste product
agriculture waste processing
agriculture processing
agriculture process
fertilizer
- Location Cumbria, UK
- Start Date January 2011
- Completion Date November 2011
- Client Farmgen UK Ltd
- Value £4m full turnkey
- Dryholme AD facility designed to process 35,000T per annum of agricultural waste streams for power generation
- The facility Outputs digestate to be used as a fertiliser,
- Facility installed with 1.2MW generation capacity, with an additional 0.6MW Generation installed after.
- All key drivers met with the facility processing and outputting 95% electricity back into the grid to capitalise on government feeding in tariff and sale of exporting power.