BEA Institut für Bioenergie GmbH
Refine by
Families
1 services found

BEA Institut für Bioenergie GmbH services

Engineering

Plant Optimization Services

If the output is below the designed capacity - planning errors, poor workmanship or wrong operation may be responsible. Plenty of production plants were able to increase their output in the first years of operation. The costs for reconstruction and replacement parts, could have been partly avoided. With reduced production, the economic forecast figures can not be achieved. Advice from our experts, can speed up the optimization of the system and increase the profits. Coniferous wood or hard wood, band dryer or drum dryer, flat die or ring die presses, West or East Europe - we can point to successful reference projects.