Linka Energy A/S
Case: Lolland Heating
In 2013 Linka installed a 6,500 kW boiler line at the straw plant in Nakskov. The boiler line is part of the plant’s overall supply of the town of Nakskov.
Most popular related searches
In 2013 Linka installed a 6,500 kW boiler line at the straw plant in Nakskov. The boiler line is part of the plant’s overall supply of the town of Nakskov.