Grain Bin Installation Manual
Rev 1
DARMANI
2015 GRAIN BIN INSTALLATION MANUAL
18’ TO 36’ DIAMETER
D&R Manufacturing Ltd.
P.O. Box 63
Fiske, SK
S0L 1C0
Phone: 1-866-665-6677
Fax: 1-306-377-4430
Website: www.darmani.ca
Email: darmani@sasktel.net
2015 Darmani Bin Manual Page ii Rev 1
IMPORTANT NOTICE
KEEP GALVANIZED SHEETS
DRY BEFORE ERECTING!
If this material is allowed to get wet or condensation is permitted to form
between sheets, serious deterioration (white rust) will occur.
Upon receiving material, check for moisture between sheets. Do not permit
moisture from weather, condensation, or other sources to remain between
sheets.
To prevent white rust, store sheets away from moisture. Store under cover in a
heated building with adequate air circulation if possible. Never allow water to
stand on sheets or bundles.
Sheets covered with tarpaulin or polyethylene should have enough space
between the cover and the sheets to allow air to circulate.
If bundle gets wet, dry all materials immediately. Stack sheets on edge in a dry
place and force air between them. Allow for free passage of air around each
sheet when practical.
NEVER lay steel on earth. Raise with timber or blocks. Always store material on a
dry solid surface.
Damage resulting from failure to take appropriate actions listed above will void
Darmani Grain Storage warranty.
2015 Darmani Bin Manual Page iii Rev 1
DARMANI Grain Storage
D&R Manufacturing Ltd.
P.O. Box 63
Fiske, SK
S0L 1C0
Phone: 1-866-665-6677
Fax: 1-306-377-4430
Website: www.darmani.ca
Email: darmani@sasktel.net
NOTE: Warranty Information, Foundation, and Concrete Specifications, and Bin
Operational Procedures can be obtained at the above address.
2015 Darmani Bin Manual Page iv Rev 1
Contents
IMPORTANT NOTICE ..................................................................................................................................... ii
DARMANI LIMITED WARRANTY .................................................................................................................... 1
GRAIN BIN SAFETY SECTION .......................................................................................................................... 2
BIN OPERATION AND MANAGEMENT .......................................................................................................... 4
LOADING & UNLOADING .......................................................................................................................... 4
VENTILATION AND DRYING ....................................................................................................................... 5
EQUIPMENT LOADS................................................................................................................................... 6
MATERIAL STORED .................................................................................................................................... 7
STIFFENER INSTALLATION ......................................................................................................................... 7
ROOF ASSEMBLY ........................................................................................................................................... 8
CONTINUOUS EAVE CLIP ........................................................................................................................... 8
ROOF LADDER RUNGS AND BENT ROOF RING BRACKETS ........................................................................ 9
INITIAL ROOF SHEET ASSEMBLY .............................................................................................................. 10
ROOF SHEET ASSEMBLY .......................................................................................................................... 11
ROOF RING COMPONENTS ..................................................................................................................... 12
SIDEWALL CONSTRUCTION ......................................................................................................................... 15
SHEET LAYOUT ........................................................................................................................................ 15
DOOR CUT OUT ....................................................................................................................................... 21
OUTSIDE LADDERS .................................................................................................................................. 22
APPENDIX I – RECOMMENDED BOLT ASSEMBLY ........................................................................................ 25
APPENDIX II – WALL SHEET LAYOUT ........................................................................................................... 26
COLOUR CODING .................................................................................................................................... 26
18 FOOT STIFFENED BINS ........................................................................................................................ 27
21 FOOT STIFFENED BINS ........................................................................................................................ 28
24 FOOT STIFFENED BINS ........................................................................................................................ 29
27 FOOT STIFFENED BINS ........................................................................................................................ 30
30 FOOT STIFFENED BINS ........................................................................................................................ 31
36 FOOT STIFFENED BINS ........................................................................................................................ 32
UNSTIFFENED BINS ................................................................................................................................. 33
2015 Darmani Bin Manual Page 1 Rev 1
DARMANI LIMITED WARRANTY
www.darmani.ca 1-866-665-6677 Fiske, Sk. CANADA
DARMANI GRAIN STORAGE (DARMANI) warrants, to the original retail purchaser within 5 years from date of purchase, that the grain bin
shall be free from defects in material and workmanship. A part will not be considered defective if it substantially fulfills performance
specifications. Should any part prove defective within the warranty period, the part will be replaced without charge F.O.B. Fiske, Sk. To obtain
warranty, a copy of original invoice is required.
WARRANTY CERTIFICATION- Warranty registration card should be mailed//signed and e-mailed within two weeks of product delivery to
certify warranty coverage. WARRANTY VOID IF NOT REGISTERED.
THE FOREGOING LIMITED WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES OF
MERCHANTABILITY, FITNESS OR PURPOSE AND OF ANY OTHER TYPE, WHETHER EXPRESSED OR IMPLIED. DARMANI
neither assumes or authorizes anyone to assume for it any other obligation or liability in connection with said part, and will not be liable for
incidental or consequential damages. THE REMEDIES STATED HEREIN SHALL BE THE EXCLUSIVE REMEDIES AVAILBLE UNDER
THIS WARRANTY.
DARMANI reserves the right to change specifications, add improvements or discontinue manufacture of any of its equipment without notice or
obligation to purchasers of its equipment.
WARRANTY EXCLUSIONS- Labour, transportation, or any cost related to a service call is not provided by DARMANI. This limited warranty
does not apply to damage resulting from misuse, neglect, normal wear, accident, improper installation or maintenance. ITEMS NOT
MANUFACTURED BY DARMANI ARE COVERED UNDER WARRANTIES OF THEIR RESPECTIVE MANUFACTURERS AND ARE
EXCLUDED FROM COVERAGE UNDER THE DARMANI WARRANTY.
Foundation requirements are suggestions only and will vary according to local soil conditions. Soil bearing tests should be performed by a
competent, independent, engineering firm. DARMANI will not assume responsibility for issues arising from improper foundation design or
construction.
DARMANI will not warrant damage or loss caused, in whole or part, by inadequate or improper site selection, site preparation, foundation, or
any other failure to provide a suitable erection or installation environment for a DARMANI grain bin or any product, component, equipment,
accessories, or parts used in conjunction with a DARMANI grain bin. DARMANI will not warrant damage or loss caused, in whole or in part, by
use of the bin other than which it was designed, unauthorized attachments, modifications, alterations, improper or inadequate maintenance,
misuse or abuse of the bin
.
DARMANI is not liable for direct, indirect, incidental or consequential damages, including without limitation, loss anticipated profits or benefits.
DARMANI is not responsible for field modifications or erection defects which create structural or storage quality problems.
WARRANTY IS VOID- If not purchased from or constructed by an authorized dealer or a representative of DARMANI, or if used for substances
other than grains and//or free flowing materials.
Prior to installation, purchaser has responsibility to properly store steel bin. Bin should be stored in dry, temperature and humidity controlled
areas to eliminate condensation and other moisture concerns may that cause white rust and corrosion. Warranty does not extend to defects or
damages caused by improper storage.
DARMANI is not responsible for acts of God, accident, neglect or inadequate ventilation which includes proper maintenance ensuring vents of
any kind are free.
DARMANI does not warrant any roof damage caused by excessive vacuum or internal pressure from fans or other air moving systems. Adequate
ventilation and //or “make-up air” devices should be provided for all powered air handling systems. Warranty is void if grain is above the eave and
against the roof, as this will block roof vents and cause unwanted loads on roof sheets. The area above the surface of the grain must allow free
movement of the air to the vents or opened lid. DARMANI does not recommend the use of downward flow systems (suction). Severe structural
roof damage may occur if fans or other air moving devices are operated during certain high humidity//cold weather conditions. Roof
ventilators//vents may frost over and plug or restrict air flow causing excessive vacuum or internal pressures. Roof damage may occur due to
improperly installed grain temperature detection cable systems.
DARMANI does not warranty failures due to filling bin off center unless it is a small bin – (door with chute). If the foundation shifts, bin can be
shifted sideways causing both sidewall and roof damage.
Limitation of Remedies replacement: Within the warranty period, DARMANI will replace//repair the goods and //or original manufactured
components thereof which are found, to DARMANI ‘s satisfaction, to be defective. DARMANI is not responsible for direct, indirect, special,
consequential, or any other damages of any kind, including personal injury to any individual howsoever caused, including caused by
transportation of the goods for repair or replacement.
Procedure for obtaining Service: In the event of a warranty claim, the purchaser must complete any and all information required by DARMANI
in order to properly assess or investigate the claim. DARMANI will not be responsible for the removal of any of the goods found to be defective,
or transportation charges to and from DARMANI ‘s authorized dealer or distributor, or for installation of any replacement goods and//or parts
furnished under this warranty.
2015 Darmani Bin Manual Page 2 Rev 1
GRAIN BIN SAFETY SECTION
Recognize Safety Alert Symbols
The safety-alert symbol means
“Attention! Be Alert! Your
personal safety is involved! This
symbol draws your attention to
important instructions concerning
your personal safety. Read the
message carefully to avoid personal injury or
death.
Follow Machine Safety Signs & Messages
Observe safe operating practices. Carefully read
this manual and all safety signs on your
equipment. Safety signs must be kept in good
condition. Replace missing or damaged safety
decals or shields available at no charge from
D&R Manufacturing
Box 63
Fiske, SK S0L 1C0
Canada
Learn how to use controls and
operate equipment. Do not let
anyone operate unit
(especially youth) without
thorough training of basic
operating and safety
procedures.
Make no unauthorized modifications to
equipment. Modifications may endanger
function and//or safety of unit. Periodically check
all mechanical and electrical components.
Keep unit in good working condition.
Emergencies – Know what to do
Have emergency numbers near your telephone:
For doctors:
Emergency Medical Squad:
Ambulance:
Hospital:
Fire department:
Written directions to your location:
NEVER, NEVER, clean out bin with augers running!
When bin is nearly empty, sweep
(floor) augers travel at increasing
speed. Just turning around can
give augers time enough to trap
you. Exposed auger in sump can
cause serious injury if stepped or fallen into.
Failure to follow above precautions may cause
serious injury or death!
NEVER ENTER BIN
DANGER: Never enter bin, unless all
power is locked off and another person
is present.
Flowing grain may trap and suffocate. If you
enter a bin of flowing grain you can be
completely submerged in grain in about 8
seconds.
Purchase and use safety harness. Failure to heed
this warning may cause serious injury or death.
CAUTION:
Metal edges are sharp. To avoid injuries wear
protective clothing and handle equipment and
parts with care.
Failure to do so may cause serious injury.
CAUTION: Maintain secure hand and foot hold
when climbing on bin. Metal is slippery
2015 Darmani Bin Manual Page 3 Rev 1
when wet. Never carry items while climbing on
bin to avoid falls.
Purchase ladder and safety cages and use safety
harness.
Failure to do so may cause serious injury or death.
Grain Bin Safety
Safety decals should be mounted on your
equipment as shown on this page. Safety decals
are mounted whenever possible at factory.
Yearly and prior to equipment use,
please check that all decals are in
place according to these drawings and
in good, legible condition. To order a
replacement decal (no charge) contact your
dealer or
D&R Manufacturing
Box 63,
Fiske, SK S0L 1C0.
Please specify Label Number.
1. WARNING DECAL – L0164
2. DANGER DECAL – L0258
3. CAUTION DECAL – L0269
4. WARNING DECAL – L0281
Labels 1, 2 and 4
Near Ladder or stairs
Labels 1 and 2
Inside of
Inspection Portal
Labels 1, 2, 3 and 4
Inside of Door Skin
Label 3
Next to Unload
Labels 2 and 3
Outside of Door Skin
Labels 1 and 2
On Sheet beside
Inspection Portal
2015 Darmani Bin Manual Page 4 Rev 1
BIN OPERATION AND MANAGEMENT
Darmani Grain Storage’s warranty will NOT cover equipment, materials or labor resulting in damage caused by misuse.
LOADING & UNLOADING
INCORRECT CORRECT
OFF CENTER (ECCENTRIC) UNLOADING
Darmani grain bins must be unloaded
from the center unloading sump until
all possible grain has been removed
by this sump. Then, and only then,
can auxiliary sumps be utilized.
Off center (eccentric) unloading at
floor or wall can cause excessive
pressures and can result in sidewall
buckling.
CENTER UNLOADING
OFF CENTER (ECCENTRIC) LOADING
Darmani grain bins must be loaded
through the center roof cap to have
uniformly distributed grain inside the
bin.
Off center (eccentric) loading on
sidewalls can cause an excessive
overturning moment at the base
which may result in the bin leaning or
tipping and//or sidewall and stiffener
buckling.
CENTER LOADING
WITHOUT A PROPER SIDEDRAW SYSTEM
Do not unload the bin from the
sidewall without proper installation of
a side draw system. Please consult
Darmani Grain Storage for side draw
options. (Note: Farm duty bins are not
designed for a side unloading system.)
WITH SIDEDRAW BIN UNLOADS IN
LAYERS EVENLY
2015 Darmani Bin Manual Page 5 Rev 1
VENTILATION AND DRYING
INCORRECT CORRECT
FAILURE TO OPEN ROOF VENTS WHEN
FAN IS TURNED ON
Grain bins are not
designed to withstand
excessive air pressure
differentials. General
recommendations are
that the minimum area for
air escape should not be
less than twice the cross
sectional area of the main
duct of a properly
designed aeration system.
ALL ROOF VENTS OPEN
FAILURE TO HAVE ADEQUATE ROOF
VENTS FOR AIR INLET
Maximum recommended
pressure differential in the
roof area is 1” static
pressure. Be alert to the
possibility of a frost build
up on air passage screens
to the point of complete
blockage. This may occur
with high relative humidity
and near freezing
temperatures.
Precautionary measures
must be taken to prevent
this condition.
ADEQUATE ROOF VENTS FOR AIR INLET
NEGATIVE PRESSURE FAN NOT
OPERATING WITH PRESSUE FAN
If powered fans are used
in the roof vents, they must
operate simultaneously
with the fans at the base
of the bin. Failure to
ensure this could result in
roof failure
NEGATIVE AIR PRESSURE FAN STARTS
WITHIN A FEW SECONDS OF PRESSURE
FAN
BLOCKED ROOF VENTS
Grain piled in the roof
area must not block the
roof vents. Blockage of
the roof vents with grain
will reduce the effective
vent area by 95-98% and
effectively eliminated roof
vent area. The area
above the surface of the
grain must allow free air
movement to the vents
UNBLOCKED ROOF VENTS
DRYING
FAN
AERATION
FAN
NEGATIVE
PRESSURE
FAN
PRESSUE
FAN
2015 Darmani Bin Manual Page 6 Rev 1
EQUIPMENT LOADS
CORRECT INCORRECT
Don’t start up stirring machine
with down augers near wall. Shut
down system when down augers
are near the center. Down
augers should be “free” prior to
start up. Failure to do so could
cause excessive vertical wall load
which could result in sidewall
buckling.
STIRRING AND RECIRCULATING
DEVICES
Are additional wall stiffeners
required? Are additional floor
supports required? Consult
your Darmani dealer
LOADS ON BIN ROOF
All concentrated loads on the
roof must be uniformly
distributed to the peak ring.
You may need to use a
separate support tower to
properly distribute the load.
Consult Darmani for support
requirements and necessary
accessories for the support
cable
DOWNSPOUT
OFF CENTER
AND CONCENTRATED
LOAD ON ROOF
IMPROPERLY ATTACHED
TEMPERATURE CABLE
(EXAMPLE: LARGE CABLE
ATTACHED TO
SINGLE ROOF BOLT.)
PROPER ATTACHMENT.
DARMANI DESIGNED AND
APPROVED SUPPORT FOR
TEMPERATURE CABLE.
2015 Darmani Bin Manual Page 7 Rev 1
MATERIAL STORED
Darmani storage bins are designed to store dry, free flowing grain with a density up to 52 lb//ft3 (65 lb//bu)
INCORRECT CORRECT
Standard storage bins are not
designed for storage of high-
moisture grains.
Large quantities of wet grain on
top of dried grain can shrink as it
dries, causing voids. Sidewall and
stiffeners can buckle.
Due to the possibility of excessive
hoop stresses caused by grain
kernel expansion, it is
recommended that grain bins be
managed to prevent moisture
content from increasing more
that 2% during storage.
In addition, it is not advisable to
have grain moisture content
variations of more than 5% in a
storage bin.
STIFFENER INSTALLATION
CONCRETE NOT LEVEL
Stiffeners carry the vertical wall
loads on the bin: therefore they
serve as columns for the structure.
They should be attached to the
sidewall and each other exactly
as described in Darmani’s Bin
Erection Manual. They must form
a continuous column from the
eave to the concrete floor. Do
not cut the stiffeners for any
reason. If a situation occurs where
a stiffener rests over a tunnel or
you have a fan transition that is
too large to fit between stiffeners,
contact Darmani for proper
installation recommendations.
CONCRETE LEVEL
DRY GRAIN
WET GRAIN
WET (HIGH
MOISTURE)
GRAIN
DRY GRAIN
WET GRAIN
(<2%
MOISTURE
DIFFERENCE
FROM DRY
GRAIN)
DRY GRAIN
GAPS BETWEEN
STIFFENERS
SIDEWALL
BUCKLING
STIFFENERS NOT
RESTING ON
FLOOR
NO GAPS
BETWEEN
STIFFENERS
NO BUCKLING
STIFFENERS
RESTING FLAT
ON FLOOR
2015 Darmani Bin Manual Page 8 Rev 1
ROOF ASSEMBLY
CONTINUOUS EAVE CLIP
Prior to assembly of roof, it will be necessary to assemble the first (top) ring of bin sidewall. Refer to the sidewall
assembly section of this manual for proper instructions. Note: for best results, unless otherwise specified, leave all
bolts loose until roof assembly is complete. For ease of construction, assemble on a flat surface.
Figure 1 – Eave clip details
Attach continuous eave clip on the outside of the bin sidewall sheets to the top horizontal seam. An individual eave clip
will attach to every sidewall sheet. Fasten with 5//16” x 1” or 3//8” x 1” bin bolts and flange nuts. Insert bolts on the top
horizontal seam from the inside of the bin. Rib tabs can be bent back into the roof sheet rib after all roof sheets have
been assembled to the peak ring and eave clip. See Figure 1.
Important Erecting Information
When constructing using a bin with a crane, a minimum of six (6) connections is required at the peak ring.
Roof sheet laminate must be attached at the top of the roof sheet to the peak ring. See Figure 2. Attach laminate
bracket to the roof sheet and peak ring using 5//16” x 1” bin bolts and 5//16” flange nuts. These laminate brackets are
attached to each roof sheet//peak ring attaching location.
FLANGE NUT
CONTINUOUS EAVE CLIP
MOUNTED ON OUTSIDE OF BIN
EAVE CLIP RIB TABS NEED TO
BE BENT BACK INTO ROOF
SHEET RIBS
STARTS AT FIRST
HOLE AT VERTICAL
SEAM OF SIDEWALL
BIN BOLT
2015 Darmani Bin Manual Page 9 Rev 1
-
Figure 2 – Roof laminate details
ROOF LADDER RUNGS AND BENT ROOF RING BRACKETS
Installation of roof ring brackets and roof ladder rungs are attached to roof sheets using 5//16” x 1” bin bolts, 5//16”
flange nuts, and neoprene washers. Washer slips on bolts that have been inserted through roof ladder rungs and will be
compressed between roof sheet rib and roof ladder rung to ensure watertight seal. See Figure 3. Roof ring bracket, roof
ring, and U-bolt assemblies are located on the following pages. Inspection portal should be situated on the direct left or
right of the roof sheet containing the roof ladder rungs as shown.
Figure 3 – Roof accessory details
A MINIMUM OF SIX (6) ATTACHING LOCATIONS TO
THE PEAK RING IS REQUIRED WHEN ERECTING BIN
WITH A CRANE.
5//16 x 1” BOLT
ROOF SHEET
LAMINATE
5//16” FLANGE NUT
5//16” x 1”
BOLTS
ROOF LADDER RUNG
NEOPRENE WASHER
ROOF RING BRACKET
ROOF RING BRACKET
ROOF LADDER RUNGS
ROOF RING
INSPECTION PORTAL
2015 Darmani Bin Manual Page 10 Rev 1
INITIAL ROOF SHEET ASSEMBLY
Figure 4 – Starting Roof Details
Place support jack in center of side wall ring. See peak ring height chart below for approximate support setting. This
height is a supporting point. You may need to raise or lower the jack to ensure that the holes in the roof sheets match
up with the holes in the eave clips. Note: An adjustable center support jack will allow for incremental adjustments
making assembly for rood to eave clips easier. See Figure 4.
If possible, fasten peak ring to center support jack using upper bolt holes. Begin installing four (4) individual roof panels,
placing them directly opposite each other so roof is quartered. Use 5//16” x 1” bolts and 5//16” flange nuts.
Measurements are to be taken from foundation to top of peak ring.
Table 1 - Height of roof and one sidewall sheet
Bin Diameter Height
18’ 8’4”
21’ 9’4”
24’ 10’3”
27’ 11’2”
30’ 12’2”
36’ 14’2”
*ALL DIMENSIONS FROM TOP OF PEAK RING
STARTER RING
ATTACH ROOF SHEET TO EAVE
CLIPS WITH 5//16 x 1” BIN BOLTS
AND 5//16” FLANGE NUTS
QUARTER ROOF WITH
FOUR STARTER SHEETS
ATTACH ROOF SHEET TO PEAK
RING WITH 5//16” X 1” BIN BOLTS
AND 5//16” FLANGE NUTS
2015 Darmani Bin Manual Page 11 Rev 1
ROOF SHEET ASSEMBLY
Leave the bolts out of right hand rib at top when viewing panel from outside of sidewall ring. This will allow assembly to
continue in a counter-clockwise direction. When attaching roof sheet to eave clip, leave bolt closest to left-hand rib out
on the four starter sheets, as this will need to be lifting for assembling last roof panel in each section.
Figure 5 – Assemble roof counter-clockwise
Slide next roof panel into place overlapping the ribs. Use care to lay sheet flat when sliding panel up the roof as gouging
may occur to roof sheet already in place. Continue to place two (2) or three (3) panels in each section, then move across
and do the same. Fasten to peak ring with 5//16” x 1” bolts. Fasten to continuous eave clip using 5//16” x 1” bolts and
5//16” flange nuts. To install last panel in each section slide panel into place by lifting starter sheet. Add bent roof ring
brackets at appropriate location with opening towards peak ring. See chart in Roof Ring Component section for the
appropriate location of the bent roof ring mounting brackets. Assemble roof ladder rungs on designated roof sheet. See
Figure 5.
Install 5//16 x 1” bolts and 5//16” flange nuts in all of the rib holes. Note: Use an extra seal washer (supplied) on the bin
bolt between any accessories and roof panel. This includes roof ladder rungs, bent roof ring brackets, and any other
accessories used on the roof. This will provide a better protective seal against leakage. Tighten all roof assembly bolts
according to torque specifications as noted in APPENDIX I – RECOMMENDED BOLT ASSEMBLY
IMPORTANT: At no time should any bolts be substituted for those supplied by DARMANI Grain Storage.
ASSEMBLE COUNTER-CLOCKWISE
2015 Darmani Bin Manual Page 12 Rev 1
ROOF RING COMPONENTS
Table 2 - Quantity of roof ring components
Bin
Diameter
Roof Ring Bracket
Location *
Internal
Tube
Splices 8”
Expanders
10’ Pieces
14 GA
U-Bolts
18’ 3 2 2 4 10
21’ 3 3 2 5 11
24’ 4 4 2 5 13
27’ 4 4 2 6 14
30’ 5 3 3 6 16
36’
5
8
4
3
4
2
8
5
18
18
*Hole location is the hole number from the bottom edge of the sheet (eave).
A roof ring consists of 10’ long sections of 1 ¼ OD, 12 or 14 ga galv tubing, rolled to a particular diameter. The primary
role of the ring is to place the roof into tension with a slight crown to both strengthen the roof and resist wind motion.
During assembly of roof panels, the roof ring brackets should have been fastened to the specified locations. As ring
sections are placed into brackets, place expander assemblies in appropriate locations. Preassembly of expanders (1” x
12” threaded rod, 1” nuts, and 1” washers) is needed before ring sections can be constructed. The 1” nuts need to be
run the center of expansion bolts and flat washers on the outside of the nuts. See Figure 6.
Figure 6 – Expander Ring Details
The first expander assembly is placed near roof ladder. The first ring section is centered on roof ladder sheet. As ring
sections are placed into bent roof ring brackets, evenly space remaining expanders around roof ring. Place tube splice
assemblies at all other locations. Figure 7 shows the 8” internal tube splice using a 5//16” x 1” bin bolt and a 5//16” flange
5//16” Flange
Nut
Roof Ring
Section
U-Bolt
Expander
Assembly
Roof Ring
Bracket
2015 Darmani Bin Manual Page 13 Rev 1
nut as a stopper. See Table 2 - Quantity of roof ring components for number of expander assemblies and internal splices
used on each ring.
2015 Darmani Bin Manual Page 14 Rev 1
Note: It may be necessary to field cut final section of pipe so ring will fit with the expander assemblies as bolts are fully
contracted. If a short piece will be less than 24” in length, split the difference between the final two (2) ring sections. In
other words, splice between two sections of roof ring so that there are two shorter sections of roof ring. See Figure 8.
Note: It may be necessary to debur any field cut edges for internal splices to fit.
Figure 7 – Splice tube details
Add tension evenly to each set of expander assemblies until a slight crowning of the roof is noted. Set the second set of
nuts (jam nuts) against expansion nuts to ensure against loosening of expander assemblies. Note: Staking (deforming)
jam nut threads with a center punch and hammer is recommended to ensure nuts do not loosen.
Figure 8 – Short roof ring details
5//16” Flange Nut
Roof Sheet
U-bolt
Roof Ring Section
8” Internal Tube Splice
5//16” Flange Nut
Roof Ring Bracket
Once expansion nuts have been set and
staking, attach 5//16” U-bolts and 5//16”
flange nuts to alternating roof ring
brackets. See Figure 6 & Figure 7.
Tighten 5//16” flange nuts to ensure roof
ring sections do not slide away from the
expander assemblies.
Attention: The possibility of the roof
expansion bolts becoming dislodged
during high winds or excessive pressure
inside the bin does exist. If this
component becomes dislodged, roof ring
will fail. To provide containment to roof
ring, be sure to follow procedures
outlined on this page. Note: Welding of
expansion and splice assembly is an
additional option.
IF SHORT PIECE CREATED IS LESS THAN 24” SPLIT THE
DIFFERENCE AND CUT TWO RING SECTIONS.
5//16” x 1 1 4⁄ ”
Bin Bolt
2015 Darmani Bin Manual Page 15 Rev 1
SIDEWALL CONSTRUCTION
SHEET LAYOUT
Prior to beginning assembly of grain bin, it is necessary to determine the desired location of components that will make
up the completed structure. See Foundation Section for typical accessory layout diagram. Locations for the bin door
unload system, and fan or fan//heater transition should have been decided when foundation was formed or poured.
Take time now to confirm desired locations of these items.
Figure 9 – Even Number of Rings Structure
Figure 10 – Odd Number of Rings Structure
To help determine where door will locate consider that on a bin with an even number of rings, (4-6-8, etc.) sidewall door
will align directly below a vertical seam in the top ring. On a bin with odd number of rings (5-7-9, etc.) sidewall door will
locate directly below mid sheet of the top ring. See Figure 9 & Figure 10. Also refer to APPENDIX II – WALL SHEET
LAYOUT for sheet layout details. Note: Prior to starting erection, sidewall panels should be located near the center of
the foundation. Keep in mind the lighter gauged panels will be used first.
Locate first (top) set of sidewall sheets. Typically this will be the lightest gauge of panels. Note: The larger the number,
the lighter or thinner the material. (For example 20 gauge is thinner than 12 gauge.). Attention: Bin logo sheet is
located in the first ring. Determine a suitable location and incorporate into sidewall pattern. Note: all sidewall panels
are reversible, that is, there is not a top or bottom.
Wipe right edge of sidewall sheet clean and apply caulking between outside row of vertical seam bolts and edge of sheet
with bin caulk. See Figure 11. A 12” strip of caulk is centered horizontally on the top & bottom of every seam.
2015 Darmani Bin Manual Page 16 Rev 1
Figure 11 –Wall Sheet sealing Detail
Figure 12 – Assemble clockwise
Stand sidewall sheets around perimeter of foundation in a clock-wise direction - see Figure 12. Bolt panels together at
vertical seam using sidewall bin bolts leaving very top and bottom horizontal seam bolt(s) out, using 5//16 x 1” bolts with
poly washer and nuts on stiffened bins, or 3//8 x 1” bolts with poly washers and nuts on unstiffened bins. Insert bolts
from the outside of the bin and fasten with nuts on the inside to ensure a watertight seal. DO NOT TIGHTEN BOLTS
UNTIL RING IS COMPLETELY ASSEMBLED.
Attach lift brackets for jacks as recommended by jack manufacturer’s specifications. Caution: Never exceed jack
manufacturer’s stated capacities. After the top ring is completed, assemble roof as outlined in Roof Assembly section of
this manual. When roof assembly is complete, tighten all roof and sidewall bolts. Refer to the Ladder, section for
proper attaching procedures of outside ladders.
Jack bin until the bottom horizontal seam is slightly higher than the next sidewall sheet, approximately 46”. Prepare
next ring of sheets by wiping clean and applying caulking as described for top ring (Figure 11). At the bottom of all
vertical seams, clean and apply a continuous length of caulk about six (6”) inches on either side. This is also done at the
center of each sidewall sheet where the top of the next vertical seam attaches. See Figure 11. Attach sidewall sheets to
the inside of the upper sheet inserting all but the first and last holes in the horizontal seam.
ONE (1) 44” STRIP
OF CAULK PLACED VERTICALLY ALONG
OUTER EDGE AS SHOWN
HANGING SHEET
ATTACH 1ST
ATTACH 2ND
12” STRIP OF CAULK CENTERED
HORIZONTALLY ON THE TOP AND BOTTOM
OF EVERY VERTICAL SEAM AS SHOWN
2015 Darmani Bin Manual Page 17 Rev 1
Figure 13 – Alignment holes on wall sheets
Note: Bolts that mate into sidewall sheets must be inserted correctly to ensure precise erection of bin. Use tapered
punches to ensure proper alignment of boltholes in the sidewall sheets. Do not leave the top or bottom boltholes of
the vertical seams for last. Each sidewall sheet, as well as the entire bin, will fit together more accurately if bolts are
inserted in these holes prior to the other holes in each sidewall sheet assembly process. See Figure 13, Details A & B.
Drilling or reaming out boltholes when sheets are not properly aligned is not recommended unless otherwise
specified.
Continue installing sidewall sheets in a clockwise direction. Bolts may be tightened when ring is complete. All Darmani
Stiffened Bins require two (2) stiffeners per sidewall panel. All stiffeners are to be installed on the exterior of the bin.
Note: Stiffeners will change in gauge (thickness) dependent upon location. Be sure to consult APPENDIX II – WALL SHEET
LAYOUT to ensure proper location of stiffener sections.
Start proper gauge stiffener with top hole of stiffener aligned with hole in second hill (4” down from top) of sidewall
sheet. Proper vertical adjustment of stiffener is important. To ensure proper vertical alignment of stiffener, take note
of where slotted bolt hole in stiffener and sidewall boltholes in each horizontal seam intersect. Proper vertical
alignment of stiffener requires slotted hole to be centered over horizontal seam bolt hole. See Figure 14 & Figure 15.
2015 Darmani Bin Manual Page 18 Rev 1
Figure 14 - 39" starter stiffener
.
Figure 15 - 83" starter Stiffener
Note: Stiffener must be positioned correctly. Use tapered punch to assure proper alignment. Do not allow stiffener
to sag. Failure to do so will result in increasing assembly difficulties.
Fasten stiffener to sidewall using 5//16” x 1” bin bolts and 5//16” nuts. Bolts that fasten stiffeners together will follow
same pattern as that used on sidewall. To prevent moisture from entering bin through stiffeners, insert bolts from the
inside of the bin.
Leave bottom two (2) sets of bolts out of stiffener, as stiffener splice will attach using these two (2) holes. After first
stiffener this will occur at top and bottom of each attaching stiffeners. Continue attaching sidewall stiffeners until first
tier of stiffeners have all been installed.
Continue installing sidewall panels adding as many rings as is required to allow for the next tier of stiffeners. With
sufficient sidewall rings installed begin installing next tier of stiffeners to sidewall. Remember: Leave out the top and
bottom bolts until time to install stiffener splice. Note: Stiffener splices occur above horizontal sidewall seams. When
attaching next tier of stiffeners it will be necessary to ensure that no more than 1//16” inch gap occurs between upper
and lower stiffener. See Figure 16.
CENTER ALIGNMENT HOLE AT
HORIZONTAL SEAM
2015 Darmani Bin Manual Page 19 Rev 1
Figure 16 - Stiffener Splice Plate Details
With upper and lower tier stiffeners in place attach stiffener splice using 5//16” x 1” bin bolts and 5//16” nuts. Note:
When next stiffener down (below) increases in gauge thickness, stiffener splice plate will also increase in gauge. Always
use same gauge splice plate as heaviest stiffener being attached. Place eight (8) bolts in splice flanges and four (4) bolts
through stiffener, neoprene washer, and bin sidewall. Continue assembly of bin including stiffeners in proper sequence
as outlined in APPENDIX II – WALL SHEET LAYOUT..
Attach bottom stiffener to sidewall using appropriate sized bin bolts. Assemble bottom base to bottom stiffener with
bin bolt and flange nut. Each stiffener will include two (2) shims. One shim is required for thickness of bolt-on base
angle. An extra shim is supplied for allowances of uneven concrete surface. See Figure 17 - Stiffener Base Details.
Attach final stiffener splice and tighten bolts.
PRE ASSEMBLY OF STIFFENER
AND SPLICE IS RECOMMENDED
2015 Darmani Bin Manual Page 20 Rev 1
Figure 17 - Stiffener Base Details
If foam sealant is to be used as a seal for bin foundation, install to underside of base angle now. Lower bin onto
foundation. Precaution should be taken to ensure stiffener anchor plates clear foundation anchor bolts. Check that
stiffener anchor pads rest on foundation. One shim per stiffener is required. Shim as necessary any stiffeners not in
contact with concrete. Note: Failure to ensure proper shimming may result in damage to bin structure. Ensure
roundness of bin and check for seal. If foam base sealer is not used, seal inside of bin to concrete foundation using a
sealing compound.
Assemble square washer, ¾” round washer, and nut to anchor bolts. See chart below for the correct number of square
washers needed. The ¾” round washer is needed for the different sizes of anchor bolts and holes in the bottom bases.
Tighten as required by manufacturer’s specifications.
2015 Darmani Bin Manual Page 21 Rev 1
DOOR CUT OUT
Figure 18 - Door cut out Details
Figure 18 - Door cut out Details is viewed from the outside of the bin and shows the sheets that are assembled around a
DARMANI door. Assemble door according to the appropriate door manual, and install door with 5//16” x 1 ¼” bolts.
Attach sheets together in the proper sidewall rings.
If sidewall sheets around door are punched for 3 ring stiffeners and stiffeners are not necessary, plug empty holes. Also,
stiffened bins require a 44” stiffener to be placed in the column of stiffeners by the door. This will ensure proper
alignment of stiffeners.
Figure 19 - Assembled Door cut out sheets
2015 Darmani Bin Manual Page 22 Rev 1
OUTSIDE LADDERS
The ladder consists of side rails, rungs, and standoff brackets, bolted together with 5//16” nuts and bolts.
Figure 20 - Top Ladder Assembly
The outside ladder consists of 88” ladder rails, 11 ladder brackets and pairs of standoff brackets. The standoff brackets
normally align with the seams between the tiers of the bin; however, the first pair requires a set of 5//16” holes to be
drilled. When the top bin tier and roof are completed, attach the top ladder section: Place the ladder against the wall,
as close to center as possible on the roof panel that contains the roof ladder. Using the bottom seam on the tier to set
the position, drill out a set of 5//16” clearance holes on the fifth corrugation down to match the position of the standoffs.
Note that the topmost rung is shifted up a set of holes – this prevents a gap between the step and the eave of the roof
that may trap a foot and cause a fall. Install the first section of the ladder as shown in Figure 21 – Top Ladder Assembly
Mounting Position. When bolting to the bin, insert the bolt from the inside of the bin outwards to create a better seal.
2015 Darmani Bin Manual Page 23 Rev 1
Ladder sections can then be assembled and added to the bin as its being built. The sections are normally 88” long;
however, some model of bins may require a ½ height section on the last ring.
Figure 22 - Regular Ladder Assembly
Figure 21 – Top Ladder Assembly Mounting Position
2015 Darmani Bin Manual Page 24 Rev 1
Figure 23 - Continued Ladder Assembly
2015 Darmani Bin Manual Page 25 Rev 1
APPENDIX I – RECOMMENDED BOLT ASSEMBLY
Check that all bolts have been tightened to the proper torque values and recommended assembly procedure has been
followed.
BOLT
DIAMETER
BOLT GRADE
RECOMMENDED TORQUE
in-lb ft-lb N-m
5//16” Grade 8.2 300 25 34
3//8” Grade 8.2 540 45 61
7//16” Grade 8.2 840 70 95
1//2" Grade 8.2 1320 110 150
Periodically check bolt assembly with an accurate torque wrench to ensure that the above torque specifications are
maintained. A properly tightened bolt will compress sealing washer noticeably.
For proper dealing do not over tighten wall seam connections. Sealing is not critical on stiffener splice connections;
these connections should be tightened security to prevent loosening.
ALWAYS TIGHTEN THE NUT, NOT THE BOLT! - Hold bolt head securely when tightening the nut to prevent
damage to the sealing washer.
2015 Darmani Bin Manual Page 26 Rev 1
APPENDIX II – WALL SHEET LAYOUT
COLOUR CODING
SHEETS
SIDE WALL SHEETS OVER DOOR SHEET
GAUGE COLOUR BIN SIZE COLOUR
20 RED 18’ RED
18 BLUE 21-24’ BLUE
17 RED//BLUE 27-36’ BLACK
15 PINK
14 WHITE
18 DOOR YELLOW
18 SHORT YELLOW
STIFFENERS
GAUGE LOCATION LENGTH COLOUR
8 BOTTOM 91 YELLOW
8 MIDDLE 88 YELLOW
12 BOTTOM 91 BLACK
12 MIDDLE 88 BLACK
14 BOTTOM 91 PINK
14 MIDDLE 88 PINK
14 TOP 83 GREEN
14 TOP 39 GREEN
PEAK RINGS
SIZE COLOUR
18’ RED
21’ BLUE
24’ YELLOW
27’ PINK
30’ BLACK
36’ GALV
2015 Darmani Bin Manual Page 27 Rev 1
18 FOOT STIFFENED BINS
2015 Darmani Bin Manual Page 28 Rev 1
21 FOOT STIFFENED BINS
2015 Darmani Bin Manual Page 29 Rev 1
24 FOOT STIFFENED BINS
2015 Darmani Bin Manual Page 30 Rev 1
27 FOOT STIFFENED BINS
2015 Darmani Bin Manual Page 31 Rev 1
30 FOOT STIFFENED BINS
2015 Darmani Bin Manual Page 32 Rev 1
36 FOOT STIFFENED BINS
2015 Darmani Bin Manual Page 33 Rev 1
UNSTIFFENED BINS