GameChange Solar LP.
MaxSpan EastWest - Dual Post Driven Fixed Tilt Systems
2-4Up in Portrait, Wide Flange, Screw, or Helical Post (4-8Up in Landscape Available).
Most popular related searches
FASTER INSTALLING
- Integrated Hardware™ cuts part count and speeds install
- Fewer foundations than competing systems, which also means less posts and less post installation cost. As few as 130 posts per MW
STRONGER STEEL
- High strength steel and truss engineering combine to make industry’s longest spans and lowest post counts as few as 190 per MW for 2 up portrait and 130 per MW for 3 up portrait
- Stronger steel allows for less thickness and weight, which means lower equipment and shipping cost
SUPERIOR TERRAIN NAVIGATION
- Patent pending articulating purlins between tables enable installation on sites with complex slope issues, which when combined with post and post bracket adjustment handle up to 15% east-west terrain slopes and undulations
- Long slots enable three axes of adjustability demanded by installers for navigating real world site conditions
MaxSpan™ with Preassembled TwistClamps™Industry’s Biggest Breakthrough of the Decade in Install Speed for Fixed Tilt Structures
Preassembled “Swiss Army Knife” Beam
- One worker carry by weight
- Just bolt it onto post extender, cut zip tie, swing braces and brackets into position, and bolt down
- All hardware and brackets pre-attached and in assembly kit
- Super simple staging: one unit replaces previous staging of nuts, bolts, brackets, braces, and beam
TwistClamps™ Increase Install Speed 400%
- 400 modules per worker day versus 100 with nuts and bolts
- One worker inserts and twists all pre-assembled TwistClamps™ into purlins
- Follow-up workers slide modules under TwistClamps™
- Workers then use torque wrenches to do just one final rotation on the pre-attached serrated flange nyloc nut to reach required torque and simultaneously grounds the module
- Workers can slide modules north and south when TwistClamps™ are used so that the modules always align
