HyDevCo BV
1 services found
HyDevCo BV services
HydevCo - Standard Project Installation Services
A standard installation has a green hydrogen production volume of 30 kg per hour. Depending on the amount of hydrogen required, it is possible to carry out a project with several standard units. In addition, everything is prepared to be able to realize a project with a 10 x larger hydrogen production, so 300 kg per hour. This is a type of project that fits a central hydrogen introduction point in a network or an industrial project at a large hydrogen user.
